Project Name: LNG Supply Station Project in Dongwanghuaying village, Shenjiaying Town
Address: North of Chengjian Vanke City in Shenjiaying Town of Yanqing County, Beijing
Owner: Beijing Chengjian Vanke Tianyun Real Estate Co., Ltd.
Starting and ending time of the project: started in February 2016, completed and accepted for production in April 2016
Project survey: LNG station covers a total area of 6524.23 ㎡, two 60 m3 LNG tanks are designed in the station, with a storage capacity of about 56000 m3 ( after gasification ), two air-heated gasifiers, a single gasification capacity of 3000 Nm3/h, and supporting metering, pressure regulation, fire protection, lightning protection and other systems. The external line dn315 medium pressure (A) natural gas pipeline is newly built and the total length of the pipeline is 1483 meters.
Usage: LNG station is used in the newly built residential area and boiler room of Vanke Project in Shenjiaying Town of Yanqing County. The boiler room contains 2 set of 8t/h boilers, with nearly 3000 end users in the residential area, meeting the demand for maximum hourly gas consumption in winter.